One Contractor.
One Thermal Envelope.
We self-perform both insulated metal panel installation and roofing. No finger-pointing between subs. No gaps in your vapor barrier. One team accountable for your entire building envelope — from foundation to ridge cap.
Licensed & Certified With





Why GCs & Facility Managers Choose Us
Built-In Accountability
You'll never wonder what's happening on your job. Our systems ensure complete transparency from day one through final closeout.
Daily Photo Reports
Every day, your dedicated account manager receives a CRM-generated report with timestamped progress photos, work completed, and next-day plan.
OSHA Certified Crews
All field personnel carry OSHA 10 minimum. Superintendents and foremen hold OSHA 30 certifications. No exceptions.
Comprehensive Safety Manual
Our extensive safety program covers fall protection, hot work, confined space, and cold storage-specific protocols.
Self-Performing Crews
We don't sub out critical work. Our trained crews self-perform both IMP installation and roofing — one team, one standard.
Your Eyes on the Job — Every Single Day
Daily Progress Reports
At the end of every workday, your dedicated account contact receives a comprehensive report generated directly from our CRM. No waiting until Friday. No vague "everything's on track" emails.


Non-Negotiable Standards
Safety First. Always.
Our safety program isn't a binder on a shelf. It's enforced daily on every job site, backed by certified personnel and documented protocols.
Every crew member on every job carries a minimum OSHA 10-hour certification.
Leadership holds OSHA 30-hour certifications. They run daily toolbox talks and enforce site-specific safety plans.
Fall protection, hot work, confined space, cold storage protocols, and emergency procedures — all documented and trained.
Our Process — GC Track
From bid package to closeout, here's exactly how working with IronRidge looks when you bring us on as your roofing and IMP subcontractor.
Bid Package Review
We review your scope, drawings, and specs. Ask the hard questions upfront so there are no surprises later.
Estimate & Proposal
Detailed line-item estimate with material specs, crew plan, and realistic schedule. No hidden costs.
Contract Award
Clear terms, insurance certificates, and safety documentation delivered before mobilization.
Production
Daily CRM photo reports sent to your PM. Real-time visibility into progress, manpower, and materials.
Closeout & Warranty
Punch list, final inspection, as-builts, and manufacturer warranty registration — all handled.
Our Process — Cold Storage Track
We start with data, not a sales pitch. See exactly where your facility is losing energy and how much it's costing you before you commit to anything.
Omniverse Demo
See how our digital twin platform works. We'll show you real examples of thermal analysis and cost projections.
Facility Inspection
Thermal drone survey of your entire envelope — roof, walls, and ceilings. Non-destructive, zero downtime.
Digital Twin Analysis
We build a virtual replica of your facility. Pinpoint exactly where you're losing energy and how much it's costing you.
Proposal & ROI
Custom solution with projected savings. See your payback timeline before you commit a dollar.
Production
IMP walls + roofing installed by one crew. Daily reports with photos sent to your maintenance supervisor or facility manager.
Long-Term Monitoring
Your digital twin stays active. Track performance over time and verify the savings we promised.
Stop Coordinating Two Contractors
Most cold storage projects require separate contractors for IMP walls and roofing — two schedules, two insurance policies, two points of failure. We eliminate all of that. One contractor, one thermal envelope, one point of accountability.