IronRidge crew installing IMPs and roofing on a cold storage facility
One of 2–3 Contractors in the U.S. With This Capability

One Contractor.
One Thermal Envelope.

We self-perform both insulated metal panel installation and roofing. No finger-pointing between subs. No gaps in your vapor barrier. One team accountable for your entire building envelope — from foundation to ridge cap.

Licensed & Certified With

Johns Manville — A Berkshire Hathaway Company
Kingspan Insulated Panels
Metl-Span — A Nucor Company
ISN — Collect. Verify. Connect.
Global Cold Chain Alliance

Why GCs & Facility Managers Choose Us

Built-In Accountability

You'll never wonder what's happening on your job. Our systems ensure complete transparency from day one through final closeout.

Daily Photo Reports

Every day, your dedicated account manager receives a CRM-generated report with timestamped progress photos, work completed, and next-day plan.

OSHA Certified Crews

All field personnel carry OSHA 10 minimum. Superintendents and foremen hold OSHA 30 certifications. No exceptions.

Comprehensive Safety Manual

Our extensive safety program covers fall protection, hot work, confined space, and cold storage-specific protocols.

Self-Performing Crews

We don't sub out critical work. Our trained crews self-perform both IMP installation and roofing — one team, one standard.

Your Eyes on the Job — Every Single Day

Daily Progress Reports

At the end of every workday, your dedicated account contact receives a comprehensive report generated directly from our CRM. No waiting until Friday. No vague "everything's on track" emails.

Timestamped progress photos uploaded daily by field crews
Written summary of work completed and next-day plan
Manpower count, material deliveries, and weather impacts logged
Sent to your PM, superintendent, or facility manager — whoever you designate
Superintendent showing daily CRM report on tablet
Every Day
Reports Delivered
IronRidge crew safety briefing on commercial rooftop

Non-Negotiable Standards

Safety First. Always.

Our safety program isn't a binder on a shelf. It's enforced daily on every job site, backed by certified personnel and documented protocols.

OSHA 10 — All Field Personnel

Every crew member on every job carries a minimum OSHA 10-hour certification.

OSHA 30 — Superintendents & Foremen

Leadership holds OSHA 30-hour certifications. They run daily toolbox talks and enforce site-specific safety plans.

Comprehensive Safety Manual

Fall protection, hot work, confined space, cold storage protocols, and emergency procedures — all documented and trained.

For General Contractors

Our Process — GC Track

From bid package to closeout, here's exactly how working with IronRidge looks when you bring us on as your roofing and IMP subcontractor.

Step 1

Bid Package Review

We review your scope, drawings, and specs. Ask the hard questions upfront so there are no surprises later.

Step 2

Estimate & Proposal

Detailed line-item estimate with material specs, crew plan, and realistic schedule. No hidden costs.

Step 3

Contract Award

Clear terms, insurance certificates, and safety documentation delivered before mobilization.

Step 4

Production

Daily CRM photo reports sent to your PM. Real-time visibility into progress, manpower, and materials.

Step 5

Closeout & Warranty

Punch list, final inspection, as-builts, and manufacturer warranty registration — all handled.

For Facility Managers

Our Process — Cold Storage Track

We start with data, not a sales pitch. See exactly where your facility is losing energy and how much it's costing you before you commit to anything.

Step 1

Omniverse Demo

See how our digital twin platform works. We'll show you real examples of thermal analysis and cost projections.

Step 2

Facility Inspection

Thermal drone survey of your entire envelope — roof, walls, and ceilings. Non-destructive, zero downtime.

Step 3

Digital Twin Analysis

We build a virtual replica of your facility. Pinpoint exactly where you're losing energy and how much it's costing you.

Step 4

Proposal & ROI

Custom solution with projected savings. See your payback timeline before you commit a dollar.

Step 5

Production

IMP walls + roofing installed by one crew. Daily reports with photos sent to your maintenance supervisor or facility manager.

Step 6

Long-Term Monitoring

Your digital twin stays active. Track performance over time and verify the savings we promised.

Stop Coordinating Two Contractors

Most cold storage projects require separate contractors for IMP walls and roofing — two schedules, two insurance policies, two points of failure. We eliminate all of that. One contractor, one thermal envelope, one point of accountability.

1
Contractor
Not two or three
1
Schedule
No coordination gaps
1
Warranty
No finger-pointing